Production space with the power, floor, loading and zoning a manufacturing line needs.
- Best fit
- Industrial & logistics
- Also fits
- Build-to-suit & land
- Also fits
- Flex & R&D
A manufacturing facility has to support the process before anything else. Power, slab, crane capacity, ventilation and zoning decide whether a building can work at all, and the cost of getting them wrong is measured in lost production. We take requirements for light, heavy and advanced manufacturing, in existing buildings or purpose-built facilities.
What the space has to do
- Heavy power
- Electrical service sized for the production equipment, often with three-phase power, transformers on site and room for future load.
- Slab and floor loading
- A slab thick and flat enough for heavy machinery, with foundations or pits where equipment requires them.
- Cranes and clear span
- Bridge cranes, crane-ready structure or column spacing that leaves room for the line and material flow.
- Process utilities
- Water, sewer and gas capacity, compressed air, process exhaust and ventilation suited to the work done in the building.
- Zoning and permits
- A site where the use is permitted, with air, water and fire permits that the operation can obtain on its schedule.
In the lease
- Specialized improvements such as cranes, pits and heavy power are expensive to install and remove. Agree who pays, who owns them and what happens to them at the end of the lease.
- Environmental terms deserve close attention: baseline site conditions, permitted materials, and each party's responsibility for remediation.
- Manufacturing leases tend to run longer and include renewal options, so the tenant can recover its investment in equipment and fit-out.
- Incentives from state and local programs often depend on job and investment commitments. Line up the lease schedule with any incentive agreement.
Questions we hear
Should we lease an existing building or build new?
It depends on how specialized the process is. If an existing building meets the power, floor and height requirement with reasonable upgrades, it is usually faster. When it would take extensive rework, a build-to-suit can be the better long-term answer.
Will you allow hazardous materials in the building?
It depends on the materials, the quantities and the building. Tell us what the process uses; permitted use, storage and code requirements are agreed before a lease is signed.